







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Oakland, CA
A tub-to-shower conversion in Oakland typically runs $6,500 to $15,000, and most jobs are finished in 5 to 10 working days. It’s the remodel we do most often for homeowners who are done stepping over a 17-inch tub wall and want a low-threshold shower they can use for the next twenty years without worrying about the floor underneath. Before any tile comes off, you get a written price you can hold us to, a written guarantee, and a real arrival window. Call Penhallow Remodeling Oakland at (888) 403-1237 and a live person answers, day or night.
The work is more than swapping tub for pan. In Oakland’s older housing stock, the subfloor under a tub is often the first thing we need to inspect, and sometimes the most expensive surprise. That’s why we open the floor, document what’s there, and price the fix in writing before we build anything back up. If you’re weighing a bigger change than a shower conversion, our overview of Bathroom Remodeling in Oakland covers layouts, tile, vanities and the full range.
Key Takeaways
- Most tub-to-shower conversions in Oakland land between $6,500 and $15,000, depending on size, waterproofing and glass.
- We give you a written price before demo and a background-checked, uniformed technician on every visit.
- Every conversion is covered by our 365-Day Done Right Promise, in writing, on the job.
- We replace the shower pan, moisture barrier and cement board substrate as one assembly, not as separate shortcuts.
- Call (888) 403-1237 for a free estimate and an honest answer on whether your floor needs more work than you expected.

What a Tub-to-Shower Conversion Actually Involves
The term means taking out a standard alcove tub and replacing it with a shower that fits the same footprint, or a slightly deeper one if the room allows. The tub, surround tile and old valve come out. The shower pan, waterproofing (the membrane that keeps water out of your framing) and cement board substrate (the moisture-resistant layer behind your tile) go in. Then tile, glass, fixtures and trim. What makes it work is that everything below the tile gets replaced together. A new pan dropped onto old subfloor with no membrane is the kind of job that looks fine at month one and fails at month eighteen.
Our technicians have up to 22 years of experience, and most of that time has been spent in exactly this kind of work: older East Bay bathrooms with settled floors, galvanized valve bodies, and the occasional surprise where the previous owner tiled over drywall. We don’t guess our way through it. We open things up, show you what we found, and write the price down before anyone touches a tool.
When You Need Tub-to-Shower Conversion
Here’s what we hear from Oakland homeowners who call us about this job:
- The tub has become a tripping hazard. A parent or spouse can’t step over the tub lip safely anymore, and a low-threshold pan with a handheld shower solves it without a full bathroom gut.
- The tub is cracked or rusted through. A cast-iron tub with a rusted drain or a fiberglass tub with a hairline crack at the base usually isn’t worth patching, and a patch will fail again at the same spot.
- The surround tile is coming loose. When the tile starts sounding hollow or the grout line keeps opening, the moisture has already reached the substrate, and the only real fix is to rebuild the wet zone.
- Water is showing up where it shouldn’t. A soft spot in the floor by the tub, a watermark on the ceiling below, or a persistent musty smell in the hall closet are all signs the shower pan or valve is leaking.
- You’re getting older, or an older family member is moving in. A curbless or low-curb shower is the single most useful accessibility change in a bathroom, and it doesn’t have to look institutional.
- You want a shower that actually works with Oakland’s water. The East Bay’s hard water leaves mineral deposits in grout and on glass; a conversion is a good moment to choose larger tiles, epoxy grout and glass that’s easier to keep clear.

Our Tub-to-Shower Conversion Process
This is the sequence on every job, and we don’t skip steps to save a day.
- Walk-through and written price. We look at the tub, the walls, the floor and the plumbing shut-offs, then hand you a written number and a written guarantee before anything comes out. No estimate ranges that drift, no verbal ballpark.
- Demo and inspection. We remove the tub, surround and old valve, then inspect the subfloor and framing. If we find rot or an undersized drain line, we show you and price the fix before proceeding.
- Plumbing and substrate. New valve, new drain, new shower pan, then a proper waterproofing membrane over cement board substrate. This layer is invisible when the job is done, which is exactly why it’s the one we won’t shortcut.
- Tile, glass and fixtures. Tile goes on, then grout and trim, then the shower door. We install shower doors and glass using Mr-Glass and ViewLux panels, and we fit Kohler and Moen fixtures as a standard, not an upgrade.
- Final walkthrough and guarantee. We test the drain and valve, clean the site, walk you through what was done, and hand over the written guarantee that backs it for 365 days.
Tub-to-Shower Conversion Pricing in Oakland
Here’s a realistic line-item breakdown for a standard 30 by 60 inch alcove conversion in an Oakland home. Your number depends on the floor, the valve, the tile you pick and the glass.
| Item | Typical Range |
|---|---|
| Demo and disposal of old tub and surround | $400 – $900 |
| New shower pan and drain | $600 – $1,400 |
| Waterproofing membrane and cement board substrate | $700 – $1,600 |
| New valve and trim (Kohler or Moen) | $450 – $1,100 |
| Tile and installation (wall and floor) | $1,800 – $5,500 |
| Shower door and glass (Mr-Glass or ViewLux) | $900 – $2,800 |
| Subfloor repair if rot is found (contingent) | $600 – $3,000 |
| Total typical conversion | $6,500 – $15,000 |
Three things push the number toward the top of that range: a curbless design (which requires reworking the floor slope and joist depth), a larger tile format (more cuts, more waste), and any hidden rot under the tub. We price nothing as a surprise. Every homeowner gets a written price before work starts, and the number on day one is the number on the invoice. Call (888) 403-1237 for a free estimate; we’ll give you a real number, not a range that changes after demo.
Why Penhallow Remodeling Oakland
We work under The Kingswell Guarantee: say the price before the work, show up in the window we gave you, leave the place cleaner than we found it, and back the job in writing. Every technician is background-checked and arrives in uniform, so you know who’s in your home. A live person answers our phone 24/7, not a voicemail maze. And every conversion is covered by our 365-Day Done Right Promise: if the work fails within a year, we return and fix it at no charge. If a repair fails, the return visit is free, with no service call or re-inspection fee.
We’re part of the Kingswell family of companies, independently owned and operated, and we’d rather tell you a job is more than you think than sell you a conversion that won’t hold. That’s the whole pitch, and it’s why Oakland homeowners call us back.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Oakland?
Most conversions in Oakland run $6,500 to $15,000, with the median around $9,500. Tile choice, glass and any subfloor repair are the biggest variables. Call (888) 403-1237 for a free written estimate specific to your bathroom.
Can you do the conversion without a full bathroom remodel?
Yes. A tub-to-shower conversion is a focused project that stays inside the existing footprint, so you keep your vanity, toilet and flooring. If you’re thinking about a wider change, our Bathroom Remodeling page covers the full scope.
How long does a tub-to-shower conversion take?
Most take 5 to 10 working days, depending on tile and glass lead times. We give you a written arrival window and a defined completion date up front. Call (888) 403-1237 to schedule a walk-through.
What happens if something leaks after the conversion?
Our 365-Day Done Right Promise covers it: if the work fails within a year, we return and fix it at no charge, with no service call or re-inspection fee. Call (888) 403-1237 and we’ll schedule the return visit.
Contact Us
If you’re ready to replace the tub with a shower you can actually use, call Penhallow Remodeling Oakland at (888) 403-1237 for a free estimate and a written price before any work starts. A live person answers 24/7.
Written by the team at Penhallow Remodeling Oakland, serving Oakland.


